Steam and hot water at the best price, around the clock.
Our optimization technology, BoilOptimizer, runs your industrial steam or hot-water boiler on electricity when power is cheap and on gas or oil when it is not, and sells that flexibility to the grid. Production keeps its steam or heat, within limits you set.
In operation.
BoilOptimizer already runs industrial boilers at customer plants in Norway and Finland.
3
plants in operation
25MW
controlled with BoilOptimizer
Keep your boiler,
or get a new one.
BoilOptimizer
Keep your boiler. A control cabinet at the boiler and a cloud service run the electric, gas or oil boiler you already have for the lowest energy cost: when to buy energy, which energy to use, and what to sell to the grid.
About BoilOptimizerBoilers
Get a new boiler. Our own Hybrid Boiler, which switches between electricity and gas or oil without stopping the steam, or an electric boiler sized to your plant. For steam or hot water, from about 0.3 MW to over 10 MW.
About our boilersOur own Hybrid Boiler.
We designed it ourselves and build it together with a partner in Norway. It arrives as one house: boiler, burner, controls and pipework, tested before delivery.
Boiler and control, in one house.
Inside are the boiler with its burner and electric elements, the pipework, the valves and the control cabinets. On site it is connected to your pipes, power and fuel.

What could you save?
At 2025 prices
Lower energy cost
22%
€180k a year
Payback
2.5 years
Of which from the energy price alone, without selling flexibility to the grid: 14%.
2025 energy prices in southern Norway (NO2), two shifts on weekdays, with sales to the grid and typical equipment prices. Your own figure comes from the energy analysis.
Example: a 2 MW steam boiler on natural gas in southern Norway, kept and run by BoilOptimizer.